Concord Road North Project
January 20, 2021: Letter to residents regarding planning phase for low-pressure sewer system.

Smithbridge Estates Sewer Project

April 26, 2021: Smithbridge Estates Tentative Construction Schedule

March 29, 2021: Letter to residents regarding the beginning of construction on April 12, 2021.

February 12, 2021: Letter to residents regarding sewer system available for connections.

November 16, 2020: Notice to residents regarding power outage issues.

July 27, 2020: Letter to residents regarding drilling equipment and rock survey test holes in public right of way.

May 4, 2020: Letter from Pettinaro Construction Company regarding work schedule and new start date.


April 23, 2020: A message regarding the Smithbridge Estates Sewer Project:

While the Covid-19 virus has brought all construction to a temporary halt, once the Governor allows work to begin again, the developer portion of the sewer project had a planned 5-month installation period.  After the developer portion is complete, we expect to begin the Township installed portion with final completion in approximately 4-5 months after the start of our part of the project.

Total planned construction time for the project is 10-months.

Connection is not mandatory unless you are selling your home and are located within 150' of the sewer line or if your septic system fails.

Smithbridge Estates Low Pressure Sewer System PowerPoint Presentation
prepared by Walt Fazler of Bradford Engineering Associates
presented March 9, 2020
Penns Grant I & II Sewer Project

March 29, 2021: Letter to residents regarding lawn restoration to begin week of April 5, 2021.

February 19, 2021: Updated Penns Grant Schedule

January 8, 2021: Updated Penns Grant Tentative Construction Schedule

December 29, 2020: Lateral Connection Notice

December 8, 2020: The Penns Grant Construction Schedule is currently being updated. It will be posted once it is available.

November 9, 2020:
Penns Grant Tentative Construction Schedule

September 16 2020: Letter to residents confirming plans to install a wastewater collection system and information on connection procedure.


Penns Grant I & II Sewer Project PowerPoint Presentation
prepared by Walt Fazler of Bradford Engineering Associates